Tony's Pizza's production function is shown in the table above. Tony hires workers at a wage rate of $50 a day and his total fixed cost is $100 for Plant 1 and $150 for Plant 2.
a) Calculate Tony's Pizza's average total costs for Plant 1. Draw the short-run average total cost curve.
b) Calculate average total costs for Plant 2. Draw the short-run average total cost curve on the same figure that you used for part a.
c) In the figure, illustrate Tony's long-run average cost curve.
d) If Tony wants to produce 34 pizzas per day, what plant size should he choose? Over what output range is it efficient to operate Plant 1?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q483: Output (pizzas per day) Q484: Over the range of output for which Q485: In the long run, total variable cost Q486: Tony's Pizza's production function is shown in Q487: A firm's minimum efficient scale is the Q488: The long-run average cost curve is the Q489: In the long run, total fixed cost Q491: A firm's long-run average cost curve is Q492: Tony's Pizza's production function is shown in Q493: When a firm's long-run average cost is
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents