Using Scrum methodology, specific features are created according to four distinct phases during each sprint. The last phase includes the__________ and documentation of the feature.
A) design
B) build
C) testing
D) delivery
E) analysis
Correct Answer:
Verified
Q72: Scrum uses_ as deliverables.
A) work products
B) work
Q73: Short time frames (time boxes) that typically
Q74: _is the Agile principle that prescribes the
Q75: A(n)_ is a person who acts on
Q76: The development team is a key role
Q78: _projects evolve rather than are executed.
A) Agile
B)
Q79: When teams reflect, learn, and adapt to
Q80: The_ method assumes essential requirements can be
Q81: Identify and describe the phases included in
Q82: The product backlog is prioritized by the