The approach to estimating project time and cost that begins with an overall estimate for the project and then refines estimates for various stages of the project as it is implemented is known as ____________.
A) range estimating
B) parametric procedure
C) template method
D) phase estimating method
E) WBS method
Correct Answer:
Verified
Q68: Mega projects are large-scale, complex ventures that
Q69: The salary of the project manager and
Q70: A way to improve estimates on future
Q71: The information necessary to conduct a bottom-up
Q72: The preferred method for situations where the
Q74: Consider a five-mile-long railroad tunnel. Tunnel experts
Q75: A project estimator is working on estimates
Q76: The top-down method of estimating project time
Q77: The estimating approach that is best to
Q78: The bottom-up method of estimating where work
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents