Consider the following table of activities that describes a project network. After all the crashing you can do is done (assuming you can crash only one activity at a time) , how many paths are critical? Which activities remain noncritical? Would you characterize this network as sensitive or insensitive?
A) Two critical paths, only C is noncritical, insensitive
B) Three critical paths, only E is noncritical, sensitive
C) Four critical paths, only D is noncritical, sensitive
D) Three critical paths, only C is noncritical, sensitive
E) Two critical paths, only E is noncritical, insensitive
Correct Answer:
Verified
Q76: When crashing a schedule, this may set
Q77: Reducing the duration of an activity is
Q78: Because direct costs are assumed to be
Q79: Compressing activities on a project with a
Q80: The _ time for an activity represents
Q82: Why is the project duration with the
Q83: Why should a project manager be cautious
Q84: Given an equal level of risk and
Q85: _ is the rearranging of the project
Q86: An activity's normal time and cost are
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents