Christopher's Cranks uses a machine that can produce 100 cranks per hour. The firm operates 12 hours per day, five days per week. Due to regularly scheduled preventive maintenance, the firm expects the machine to be running during approximately 95% of the available time. Based on experience with other products, the firm expects to achieve an efficiency level for the cranks of 75%. What is the expected weekly output of cranks for this company?
A) 5100
B) 5700
C) 4845
D) 8421
E) 4275
Correct Answer:
Verified
Q129: Which of the following represents an aggressive
Q130: The staff training center at a large
Q131: Capacity decisions are based on technological concerns,
Q132: Utilization is the number of units a
Q133: The Academic Computing Center has five trainers
Q135: Geographic information systems can assist the location
Q136: Design capacity is the theoretical average output
Q137: Using GIS software, Home Depot only opens
Q138: One drawback of GIS is that it
Q139: Effective capacity is typically lower than design
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents