Brandon's computer shop sells most of its computers to a high-end customized online retailer and sales are steady at 400 per month. A single work cell produces the computers. To produce the computer, three operations are required. First the parts must be assembled, next software must be installed, and finally the computer must be safely packed and labeled for shipping. These operations take 1 hours, 3 hours, and 1 hour respectively. If there are 8 available work hours each day and the shop operates 20 days per month find the takt time.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q272: A work cell is scheduled to build
Q273: Why do work cells increase the utilization
Q274: Heuristics are problem-solving procedures that mathematically optimize
Q275: The minimum number of workstations depends upon
Q276: A work cell is required to make
Q278: A fabrication line and an assembly line
Q279: A product requires 24 separate tasks, and
Q280: Product-oriented layouts tend to have high levels
Q281: Which one of the following is NOT
Q282: In a product-oriented layout, what is the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents