Five jobs are waiting for processing through two work centers. Their processing time (in minutes) at each work center is contained in the table below. Each job requires work center Alpha before work center Beta. According to Johnson's rule, what is the optimum sequence of jobs and the minimum time for completion of all jobs?
A) S-V-U-T-R; 185
B) R-T-S-U-V; 250
C) S-V-U-T-R; 340
D) R-T-S-U-V; 340
E) S-V-U-T-R; 210
Correct Answer:
Verified
Q79: Five jobs are waiting to be processed.
Q80: Flow time represents the time:
A) an order
Q81: Consider the arrival of patients into a
Q82: An approach to sequencing that can handle
Q83: A practitioner of family medicine begins her
Q85: What are four main criteria by which
Q86: Which of the following scheduling rules gives
Q87: _ determines the order in which jobs
Q88: _ determine the sequence of jobs in
Q89: What is the primary disadvantage of the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents