Solved

Case 6.1 the Edward James Toy Company Uses a Kanban System to System

Question 114

Multiple Choice
Case 6.1
The Edward James Toy Company uses a Kanban system to make plastic wheels that are a component of several toys. The waiting time for a container of the wheels during production is 0.25 day; average processing time is 0.15 day per container. Each container holds 200 wheels. The company uses 2,000 wheels a day in the production of its products.
-Use the information in Case 6.1. How many Kanban containers would be required if a 10% policy variable is used?
A) three or fewer
B) four or five
C) five or six
D) seven or more

Case 6.1
The Edward James Toy Company uses a Kanban system to make plastic wheels that are a component of several toys. The waiting time for a container of the wheels during production is 0.25 day; average processing time is 0.15 day per container. Each container holds 200 wheels. The company uses 2,000 wheels a day in the production of its products.
-Use the information in Case 6.1. How many Kanban containers would be required if a 10% policy variable is used?


A) three or fewer
B) four or five
C) five or six
D) seven or more

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents