
Case 6.1
The Edward James Toy Company uses a Kanban system to make plastic wheels that are a component of several toys. The waiting time for a container of the wheels during production is 0.25 day; average processing time is 0.15 day per container. Each container holds 200 wheels. The company uses 2,000 wheels a day in the production of its products.
-Use the information in Case 6.1. Using a policy variable of 5%, calculate the number of Kanban containers needed for the wheels.
A) three or fewer
B) four or five
C) five or six
D) seven or more
Correct Answer:
Verified
Q97: An item sells at a rate of
Q98: What are the four underlying principles of
Q99: List and briefly define the 5S Practices
Q100: What is the difference between the "push"
Q101: Which one of the following statements regarding
Q103: Some Kanban systems are set up without
Q104: Combining parts or products with similar characteristics
Q105: A _ is based on both a
Q106: An important mechanism for lean systems is
Q107: A _ is a workstation in which
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents