Takt time is the cycle time needed to maximize utilization of an organization's workers and equipment.
Correct Answer:
Verified
Q20: The just-in-time (JIT) philosophy is the belief
Q21: One tactic of Total Preventive Maintenance (TPM)
Q22: A firm that averages sales of 320
Q23: A power cord that can be plugged
Q24: Just-in-time (JIT) systems rely on inspectors to
Q26: Five S practices can be applied to
Q27: In lean systems, the need for single-digit
Q28: Mixed-model assembly is a type of assembly
Q29: Firms that have highly repetitive processes and
Q30: Productivity tends to increase when components are