A manager is interested in setting a time standard for a machining operation. Which one of the following is least likely to be of use?
A) time-study method
B) elemental standard data approach
C) predetermined data approach
D) work sampling method
Correct Answer:
Verified
Q141: Scenario 2.5
A job consists of three distinct
Q142: Scenario 2.5
A job consists of three distinct
Q143: Scenario 2.3
A job consists of three elements.
Q144: Scenario 2.3
A job consists of three elements.
Q145: Garman observes a worker assembling peanut valves
Q147: Scenario 2.3
A job consists of three elements.
Q148: Scenario 2.2
Garman observes a worker assembling peanut
Q149: Scenario 2.5
A job consists of three distinct
Q150: Keith assembles peanut valves and the recorded
Q151: Scenario 2.2
Garman observes a worker assembling peanut
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents