Table J.9
There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.
-Using the information in Table J.9 and the slack per remaining operations (S/RO) rule, what should be the sequence of jobs processed at Workstation 1?
A) A-B-C
B) B-C-A
C) C-B-A
D) B-A-C
Correct Answer:
Verified
Q62: A(n) _ specializes in medium- to high-volume
Q63: Table J.11
Work center Q45 has four jobs
Q64: Table J.9
There are three jobs available for
Q65: Table J.10
A workstation has six jobs waiting
Q66: _ is a priority sequencing rule that
Q68: Table J.18 Q69: Table J.11 Q70: A(n) _ specializes in low- to medium-volume Q71: Table J.8 Q72: Table J.18
Work center Q45 has four jobs
Auto Data produces custom engineering testing