A system that calls for subassemblies and components to be manufactured in very small lots and delivered to the next stage in the production process as they are needed is known as a ________ operation.
A) time-maximization-process (TMP)
B) just-in-time (JIT)
C) just-the-right-size (JRS)
D) time-based competition (TBC)
E) computer-integrated manufacturing (CIM)
Correct Answer:
Verified
Q93: A failure of _ can result in
Q94: In flexible factories, scheduling decisions are made
Q95: Gloria manages a large chemical plant that
Q96: Strategies aimed at reducing the total duration
Q97: A design approach in which all relevant
Q99: The factor that differentiates flexible factories from
Q100: The movement of resources into the organization
Q101: As a manager working directly under the
Q102: The top management of EatWell, a snack
Q103: Explain Edward Deming's "14 points" approach to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents