You have been called in as a consultant to set up a Kanban control system. The first thing to do is to determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety stock should be set at 25 percent of the demand during lead time. The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours. You found that the number of Kanban cards needed is 47. Your client now tells you that they miscalculated the demand and the true demand is 300 per hour. All other things remain the same. What is the most appropriate answer from the choices below?
A) Number of Kanban cards will stay the same at 47.
B) Number of Kanban cards will decrease to 24.
C) Number of Kanban cards will increase to 94.
D) Number of Kanban cards will increase to 107.
E) Number of Kanban cards will increase to 113.
Correct Answer:
Verified
Q75: Group technology (GT) is credited with which
Q76: Which of the following is a lean
Q77: Which of the following address elimination of
Q78: In the textbook, Toyota's Tai-ichi Ohno identified
Q79: You have been called in as a
Q80: In setting up a Kanban control system
Q81: In a Kanban card calculation problem, other
Q82: Consider the relationship between optimal lot size
Q83: Which of the following is not listed
Q85: Which of the following is a lean
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents