You have been called in as a consultant to set up a Kanban control system. The first thing to do is to determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety stock should be set at 25 percent of the demand during lead time. The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours. Which of the following is the number of Kanban card sets necessary to support this situation?
A) 42
B) 47
C) 68
D) 89
E) 94
Correct Answer:
Verified
Q65: To develop a lean manufacturing system a
Q66: To implement a flow process in developing
Q67: Which of the following statements holds true
Q68: Which of the following is an element
Q69: When implementing a lean production system, a
Q71: In a lean production system, we expect
Q72: To implement lean production schedules, a firm
Q73: In designing a lean production facility layout,
Q74: An activity where the parts that go
Q75: Group technology (GT) is credited with which
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents