In this type of production, the typical scheduling approach is infinite forward scheduling typical: priority control; typically labor-limited, but often machine-limited; often responding to just-in-time orders from customers or MRP due dates.
A) Projects
B) Mid-volume manufacturing
C) Continuous processes
D) Low-volume workcenters
E) High-volume manufacturing
Correct Answer:
Verified
Q59: Transfer batch is another term for process
Q60: According to the theory of constraints, throughput
Q61: In a process sequence where a product
Q62: The effects of statistical variations in processing
Q63: MRP uses forward scheduling, beginning with the
Q65: Looking at the loads that are placed
Q66: Labor cost and machine hours are ignored
Q67: Because of statistical fluctuation (processing times vary
Q68: In a process sequence where a product
Q69: JIT requires vendors to be located nearby.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents