A factory with a sustainable output of 5,000 parts per day has averaged 4,600 parts per day for the last month. What is the factory's capacity utilization over this period (given as a percentage) ?
A) 108.7%
B) 400%
C) 92%
D) Cannot be determined without a given design capacity
Correct Answer:
Verified
Q47: A hand car wash facility was designed
Q48: The fundamental rethinking and redesign of a
Q49: Effective capacity is expected to be _
Q50: Capacity planning that includes making decisions about
Q51: Business process reengineering, in a modern context,
Q53: An alternative name for a process flowchart
Q54: The maximum number of units that a
Q55: Actual throughput level is referred to as?
A)
Q56: A cell phone repair company is struggling
Q57: Short-range capacity planning includes all of the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents