Consider a work center with a demand rate of 20 parts per hour and using a container that can hold 5 parts. It is estimated that the container takes 30 minutes to cycle through the work cell. Assume a safety stock level of 10 percent. What is the maximum inventory level for this system?
A) 5
B) 10
C) 15
D) Cannot be determined from the information given
Correct Answer:
Verified
Q80: Offsetting carbon emissions from operations is referred
Q81: The Japanese term Shitsuke is associated with
Q82: The Japanese term Seiketsu is associated with
Q83: Safety, in the context of lean systems,
Q84: SMED is most closely related to which
Q86: Increasing the time required for a container
Q87: A "waste hunt" would be most associated
Q88: A lean layout will typically require _
Q89: Decreasing the assembly line demand rate will
Q90: Successfully implementing lean can potentially result in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents