The upper and lower control limits are positioned so that when the process is in control the probability of an individual value of the output variable falling outside the control limits is very large.
Correct Answer:
Verified
Q71: Control charts are the tool of choice
Q72: A business that operates out-of-control processes risks
Q73: Control charts may only be used for
Q74: A system receives inputs from its environment,
Q75: (Situation A) To construct a p-chart
Q77: If quality is designed into products and
Q78: If a capability analysis study indicates that
Q79: Control limits and specification limits are essentially
Q80: Control charts are useful for evaluating the
Q81: (Situation D) A walk-in freezer thermostat
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents