Solved

The Standard Factory Overhead Rate Is $7

Question 110

Multiple Choice

The standard factory overhead rate is $7.50 per machine hour ($6.20 for variable factory overhead and $1.30 for fixed factory overhead) based on 100% of normal capacity of 80,000 machine hours. The standard cost and the actual cost of factory overhead for the production of 15,000 units during August were as follows: The standard factory overhead rate is $7.50 per machine hour ($6.20 for variable factory overhead and $1.30 for fixed factory overhead)  based on 100% of normal capacity of 80,000 machine hours. The standard cost and the actual cost of factory overhead for the production of 15,000 units during August were as follows:   ​ -Incurring actual indirect factory wages in excess of budgeted amounts for actual production results in a _____ variance. A) quantity B) controllable C) volume D) rate
-Incurring actual indirect factory wages in excess of budgeted amounts for actual production results in a _____ variance.


A) quantity
B) controllable
C) volume
D) rate

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents