The standard factory overhead rate is $7.50 per machine hour ($6.20 for variable factory overhead and $1.30 for fixed factory overhead) based on 100% of normal capacity of 80,000 machine hours. The standard cost and the actual cost of factory overhead for the production of 15,000 units during August were as follows:
-The fixed factory overhead volume variance is
A) $12,000 unfavorable
B) $12,000 favorable
C) $14,000 unfavorable
D) $26,000 unfavorable
Correct Answer:
Verified
Q93: Q99: The following data relate to direct materials Q102: The standard factory overhead rate is $7.50 Q106: Q107: Use this information for Zoyza Company to Q108: The standard factory overhead rate is $7.50 Q110: The controllable variance measures Q117: Use this information for Zoyza Company to Q124: The variable factory overhead controllable variance is Q126: Use this information to answer the questions
A) operating results at
A)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents