A poorly-planned information system can result in:
A) Employee resistance and even sabotage
B) Inflexible systems which are hard to maintain or modify
C) Systems that solve the wrong problems
D) all of these are true
Correct Answer:
Verified
Q74: Which of these should come first when
Q76: Once all facts and data have been
Q86: Which of these statements is true?
A)Accountants need
Q88: A student fails a course at his
Q89: Which of the following is an objective
Q90: Systems design usually comes after:
A)Systems analysis
B)Systems funding
C)Systems
Q93: A waitress brings cold food to a
Q107: The most important factor in planning for
Q109: Which of these are the five feasibility
Q120: In conducting a feasibility study, operational feasibility