An assembly line with 30 activities is to be balanced. The total amount of time required for all 30 activities is 45 minutes. The line will operate for 420 minutes per day. Which of the following must be the cycle time to achieve an output rate of 300 units/day
A) 0.80 minutes
B) 1.4 minutes
C) 2.4 minutes
D) 3.0 minutes
Correct Answer:
Verified
Q3: One of the differences between product layouts
Q4: Facility layout does not enhance sustainability in
Q5: The design of service facilities requires the
Q6: A Gallup study showed that there is
Q7: _is concerned with improving productivity and safety
Q9: Research has shown that bringing the outdoor
Q10: According to a study conducted by Software
Q11: Process layouts require simple planning and control
Q12: The objective of assembly-line balancing is to:
A)
Q13: Which of the following is true of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents