Which of these is true when designing control procedures for a computer system?
A) Control procedures are irrelevant
B) Control procedures should be designed and implemented after the proposed system is functioning properly
C) Control procedures should be built into the system as it is designed
D) Control procedures should be implemented regardless of their costs
Correct Answer:
Verified
Q97: Which of these is not a phase
Q98: Which of the following is least likely
Q99: One mistake that a study team can
Q100: The four phases of the systems development
Q101: Converting to a new computerized system will
Q103: The choice of developing its own system
Q104: Which of these is not a common
Q105: Within the context of systems studies, a
Q106: All of these are examples of typical
Q107: The most important factor in planning for
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents