The risk model is defined as AR = IR x CR x DR.The risk of assessing control risk too low can lead to:
A) The auditor performing more work than needed, thus wasting resources.
B) The auditor failing to do additional work that should be done.
C) Poor choice of procedures.
D) Expanding sample sizes required for statistical sampling of account balances.
Correct Answer:
Verified
Q20: For which of the following audit tests
Q27: As a result of tests of controls,
Q28: The probability that an auditor's conclusion based
Q29: Which of the following is an advantage
Q30: The purpose of tests of controls is
Q31: In a sample-based audit of an account
Q33: In testing controls over invoices an auditor
Q33: Which of the following courses of action
Q35: Non-statistical sampling may be better to use
Q37: After extrapolating the results of performing substantive
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents