A control would be ineffective _______.
A) if it was performed
B) if it was not performed, or if it failed to function as designed
C) if it was not performed only
D) if it failed to function as designed only
Correct Answer:
Verified
Q68: An observed condition that provides evidence that
Q69: If the test results do not confirm
Q70: With respect to timing, tests of controls
Q71: An audit testing strategy that can be
Q72: After the auditor has completed test of
Q74: When testing controls, _.
A)the auditor must be
Q75: The greater the amount of difference between
Q76: Working paper documentation for test of controls
Q77: Which of the following refers to a
Q78: The assurance that the _ is not
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents