Labour efficiency is measured by the
A) materials quantity variance.
B) total labour variance.
C) labour quantity variance.
D) labour rate variance.
Correct Answer:
Verified
Q59: If actual direct material costs are greater
Q60: Use the following information for questions
Bridgeware
Q61: An overhead fixed volume variance is calculated
Q62: If the standard hours allowed are less
Q63: A favourable variance
A)is an indication that the
Q65: If actual costs are greater than standard
Q69: An unfavourable labour quantity variance may be
Q71: Variances from standards are
A) expressed in total
Q119: The matrix approach to variance analysis
A) will
Q173: The overhead volume variance relates only to
A)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents