The Kanban system controls inventory through the use of
A) electronic data interchange.
B) markers or cards.
C) rigid control of safety stock.
D) reengineering the production process.
Correct Answer:
Verified
Q5: JIT reduces lead times to meet delivery
Q14: JIT avoids shutdowns due to materials shortages
Q51: Under JIT, the number and magnitude of
Q52: _ are costs of activities performed because
Q55: The demand-pull system requires goods to be
Q57: How can JIT avoid shutdowns?
A)increase in defective
Q58: A withdrawal Kanban specifies
A)how much should be
Q59: Which of the following is NOT a
Q60: _ are the costs of activities executed
Q61: Warranty work is a(n)
A)prevention cost.
B)appraisal cost.
C)internal failure
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents