The following information relates to Cranmore Manufacturing: To produce a unit of product: There is a wait time of 5 minutes before the cutting department begins a batch, 15 minutes between the cutting and welding departments, a move and pre-wait between welding and polishing of 12 minutes, and a move and pre-wait between the polishing and finishing departments of 8 minutes.
What is the cycle time of operation?
A) 60 minutes
B) 20 minutes
C) 35 minutes
D) 16 minutes
Correct Answer:
Verified
Q55: The value stream
A)is made up of all
Q56: In cellular manufacturing, cells are dedicated to:
A)produce
Q57: Which of the following is true of
Q58: The processing department can produce one unit
Q59: The following information relates to Lancashire
Q61: With multiple products in a value stream,
Q62: In calculating product costs for a value
Q63: Which of the following is NOT a
Q64: In the calculation of product costs for
Q65: Which of the following is NOT considered
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents