Two mining fields, Field A and Field B, of a coal mining company produce Lignite and Bituminous coal. The operating cost per day for Field A and Field B are $55,000 and $45,000, respectively.The recent records at the company indicate that Field A can produce 250 tons of Lignite along with 300 tons of Bituminous coal per day, whereas Field B can produce 200 tons of Lignite along with 450 tons of Bituminous coal per day. The expected demands to be met are 120,000 tons of Lignite and 170,000 tons of Bituminous coal. To minimize the operating costs of the mining fields, how many days does the company need to operate each of these fields?
Correct Answer:
Verified
Let A = number of days Field...
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q41: Three plants P1, P2, and P3
Q42: Three plants P1, P2, and P3
Q43: Robin Tires, Inc. makes two types
Q44: Zen Inc. manufactures two types of products,
Q45: A soft drink manufacturing company has
Q47: A company has three treatments that it
Q48: Michael has decided to invest $40,000 in
Q49: Ethan Steel, Inc. has two factories
Q50: Northwest California Ventures Ltd. has decided
Q51: Ethan Steel, Inc. has two factories
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents