Work packages should be ____________enough to be completed by one person or a small, well- defined group.
Correct Answer:
Verified
Q90: A work package should be specific enough
Q91: Too much detail of the work packages
Q92: Schedules are rarely perfect.
Q93: During the planning stage, a project management
Q94: _dependencies indicate the relationship of activities that
Q96: _is a network logic method that allows
Q97: _is a progressively more detailed and accurate
Q98: A WBS is the output that results
Q99: Higher- level components that are broken down
Q100: Small components used to plan, schedule, execute,
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents