A person carries a 2.00-N pebble through the path shown in the figure, starting at point A and ending at point B. The total time from A to B is 6.75 min. How much work did gravity do on the rock between A and B?
A) 30.0 J
B) -30.0 J
C) -56.0 J
D) 56.0 J
E) -36.0 J
Correct Answer:
Verified
Q7: A spinning ice skater on extremely smooth
Q14: Suppose a solid uniform sphere of mass
Q18: When is the angular momentum of a
Q37: Matthew pulls his little sister Sarah along
Q40: A stone with a mass of 1.0
Q57: A 500-kg elevator is pulled upward with
Q67: A uniform ball is released from rest
Q71: How much work would a child
Q72: A crane lifts a 425 kg
Q73: A traveler pulls on a suitcase
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents