An activity has an expected duration and an expected cost.Another name for an activity is a(n) :
A) Work package.
B) Node.
C) Critical path.
D) Event.
Correct Answer:
Verified
Q15: The term network logic means:
A)Tasks must either
Q16: Activities C,D,and E in the project represented
Q17: A backward pass is performed when it
Q18: One of the defining points of a
Q19: Draw a network of any size that
Q21: Preceding activities are those that must occur
Q22: An activity has an optimistic time estimate
Q23: The length of time expected to complete
Q24: An activity has an optimistic time estimate
Q25: Project Test Bank is composed of