Harrison Industries Has an Activity-Based Costing System with Three Activity  Factory utilities$29,000Indirect labor $7,000\begin{array}{lrr} \text { Factory utilities} &\$29,000\\ \text {Indirect labor } &\$7,000\\\end{array}

Question 141

Essay

Harrison Industries has an activity-based costing system with three activity cost pools-Processing, Batch Setup, and Other. The company's overhead costs, which consist of factory utilities and indirect labor, are allocated to the cost pools in proportion to the activity cost pools' consumption of resources. Costs in the Processing cost pool are assigned to products based on machine-hours (MHs) and costs in the Batch Setup cost pool are assigned to products based on the number of batches. Costs in the Other cost pool are not assigned to products. Data concerning the two products appear below:
 Factory utilities$29,000Indirect labor $7,000\begin{array}{lrr} \text { Factory utilities} &\$29,000\\ \text {Indirect labor } &\$7,000\\\end{array}

 Distribution of Resource Consumption Across Activity Cast Pools  Processing  Setting Up  Other  Factary utilities 0.400.100.50 Indirect labor 0.500.200.30\begin{array}{l}\text { Distribution of Resource Consumption Across Activity Cast Pools }\\\begin{array} { | l | c | c | c | } \hline & \text { Processing } & \text { Setting Up } & \text { Other } \\\hline \text { Factary utilities } & 0.40 & 0.10 & 0.50 \\\hline \text { Indirect labor } & 0.50 & 0.20 & 0.30 \\\hline\end{array}\end{array}
 MHs  Batches  Product #1 2,900700 Product #2 7,100300 Total 10,0001,000\begin{array} { l c r } & \text { MHs } & \text { Batches } \\\text { Product \#1 } & 2,900 & 700 \\\text { Product \#2 } &\underline{7,100} & \underline{300} \\\text { Total } &\underline{ 10,000}& \underline{1,000} \\\end{array}
 Product #1  Product #2  Sales $54,000$85,100 Direct materials 19,100$33,500 Direct labor 26,300$35,000\begin{array}{lrr} & \text { Product \#1 } & \text { Product \#2 } \\\text { Sales } & \$ 54,000 & \$ 85,100 \\\text { Direct materials } & 19,100& \$ 33,500 \\\text { Direct labor } & 26,300 & \$ 35,000\end{array}

Required:
a. Assign overhead costs to activity cost pools using activity-based costing.
b. Calculate activity rates for each activity cost pool using activity-based costing.
c. Determine the amount of overhead cost that would be assigned to each product using activity-based costing.
d. Determine the product margins for each product using activity-based costing.

Correct Answer:

verifed

Verified

a. Assign overhead costs to activity cos...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents