Using the assembly-line balancing procedure, which of the following is the required cycle time if the production time in minutes per day is 1,440 and the required output per day in units is 2,000?
A) 0.72
B) 1.388
C) 250
D) 500
E) Cannot be determined from the information above
Correct Answer:
Verified
Q7: In balancing an assembly line, workstation cycle
Q20: The assembly-line balancing procedure determines the precedence
Q23: A process map shows the physical location
Q24: Using the assembly-line balancing procedure, which of
Q25: Little's law states that supply chain processes
Q26: Workstation cycle time is the time between
Q29: If the sum of the task times
Q31: Little's law can be thought of as
Q38: Using the assembly-line balancing procedure, which of
Q39: A high-level map or diagram of a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents