You have been called in as a consultant to set up a kanban control system. The first thing to do is to determine the number of kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety stock should be set at 25% of the demand during lead time. The tote trays used as containers can hold 8 units of stock and the lead time it takes to replenish an order is 2 hours. Which of the following is the number of kanban card sets necessary to support this situation?
A) 42
B) 47
C) 68
D) 89
E) 94
Correct Answer:
Verified
Q51: Which of the following are related to
Q51: To implement lean production schedules a firm
Q51: The Toyota Production System identified which of
Q56: Which of the following are elements that
Q56: Applying lean concepts in manufacturing balances increases
Q58: In setting up a kanban control system
Q59: In setting up a kanban control system
Q67: Which of the following statements holds true
Q68: In implementing a lean production system you
Q75: Group technology (GT) is credited with which
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents