If estimated production overhead in the assembly department is $240,000 and actual overhead is $216,000 and estimated machine hours in the assembly department are 60,000 hours and actual machine hours are 62,000 hours, using normal costing what is the overhead allocation rate?
A) $3.60 per machine hour
B) $4 per machine hour
C) $3.87 per machine hour
D) $3.49 per machine hour
Correct Answer:
Verified
Q109: In a job costing system the accounting
Q110: Brianna's Dancewear Ltd manufactures a specialty line
Q111: Manufacturing job costing systems are least likely
Q112: Use the following estimates to calculate
Q113: In job costing recording actual overhead results
Q115: A costing system that determines an average
Q116: A rule of thumb for deciding if
Q117: Which type of company would be most
Q118: The statement concerning job costing that is
Q119: The statement concerning actual and normal costing
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents