Solved

A Production Run of 500 Items Resulted in 29 Defectives K=0.058\mathrm { K } = 0.058

Question 27

Multiple Choice

A production run of 500 items resulted in 29 defectives items.A defective item is coded as 1 and a good item as 0.The following is an output from Minitab.
Runs Test: Defects

Runs test for Defects

Runs above and below K=0.058\mathrm { K } = 0.058

The observed number of runs =57= 57
The expected number of runs =55.636= 55.636
29 observations above K, 471 below
P-value =0.574= 0.574
The null hypothesis for a one-sample runs test is __________________.


A) successive items did not constitute a random sample.
B) successive items constituted a random sample
C) the proportion of defective items is 0.05
D) the proportion of defective items is 0.058
E) the distribution is binomial

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents