Multiple Choice
Upper and lower control limits are usually based upon _______.
A) ± 3 standard deviations
B) ± 2 standard deviations
C) ± 1 standard deviation
D) ± 4 standard deviations
E) ± 6 standard deviations
Correct Answer:
Verified