The project delivery method in which only one firm is contracted for both design and construction of the building is called the
A) CMAR method.
B) CMAA method.
C) IPD method.
D) design- bid- build method.
E) design- build method.
Correct Answer:
Verified
Q36: Shop drawings are prepared during the design
Q37: All required surety bonds must be provided
Q38: The primary purpose of a mockup is
Q39: The certificate of occupancy predates substantial completion
Q40: The surety bonds used in a typical
Q42: In the CMAR method of project delivery,
Q43: In which of the three documents (construction
Q44: In most building projects, the consultants are
Q45: What is contained in the program of
Q46: The MasterFormat has two separate divisions called