The day- to- day supervision of construction is the responsibility of the
A) architect's consultants.
B) architect.
C) GC.
D) collectively of all the above.
Correct Answer:
Verified
Q30: The primary purpose of the contract modification
Q31: Of the various project delivery methods described
Q32: Who is typically responsible for obtaining the
Q33: A GC would usually require performance bond
Q34: Where the owner is sufficiently familiar and
Q36: Shop drawings are prepared during the design
Q37: All required surety bonds must be provided
Q38: The primary purpose of a mockup is
Q39: The certificate of occupancy predates substantial completion
Q40: The surety bonds used in a typical