A construction joint in a concrete slab- on- ground is required if the concrete in the slab cannot be placed in one continuous operation.
Correct Answer:
Verified
Q30: Concrete can be prestressed in two ways.
Q31: The strength of concrete in a residential
Q32: Pocket formers in a PT concrete slab-
Q33: Hooks in bars are produced by turning
Q34: The most important reason for providing ties
Q36: The most important reason for providing ties
Q37: Explain what the following terms mean: plain
Q38: Steel reinforcement in concrete elements that are
Q39: The chairs used to support reinforcing steel
Q40: The tendons used for prestressing a PT