Consider the MPS,BOM,and Inventory Data Shown Below Bill of Material:
- Item a Uses 2 Each of the Following

Question 168

Essay

Consider the MPS,BOM,and inventory data shown below.
Master Production Schedule: the following table shows the MPS start quantities.
 Finished Item A 12345678 Finished Item A MPS Start 2040302040\begin{array} { | l | l | l | l | l | l | l | l | l | } \hline \text { Finished Item A } & 1 & 2 & 3 & 4 & 5 & 6 & 7 & 8 \\\hline& & & & & & & & \\\text { Finished Item A MPS Start } & 20 & & 40 & 30 & & 20 & & 40\\\hline\end{array}
Bill of Material:
- Item A uses 2 each of component D,1 each of component C and 2 each of subassembly B.
- Subassembly B uses 2 each of component E.
Selected Inventory Data:
 Item  Lot Size  Technique  Lead Time  Scheduled  Receipts  On-Hand BLA L140 in period 1 CPOQ=3240DFOQ=2501160 in period 100ELA L22\begin{array} { | c | l | c | c | c | } \hline \text { Item } & \begin{array} { c } \text { Lot Size } \\\text { Technique }\end{array} & \text { Lead Time } & \begin{array} { c } \text { Scheduled } \\\text { Receipts }\end{array} & \text { On-Hand } \\\hline { \mathrm { B } } & \mathrm { L } A \mathrm {~L} & 1 & 40 \text { in period 1 } & \\\mathrm { C } & \mathrm { POQ } = 3 & 2 & & 40 \\\mathrm { D } & \mathrm { FOQ } = 250 & 1&160 \text { in period } & 100 \\\mathrm { E } &\mathrm { L } A \mathrm {~L} & 2& 2&\\\hline\end{array}
Construct the MRP schedule using the above information.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents