Multiple Choice
Table 10.7
-Use the information in Table 10.7.The cumulative sum of errors CFE from months 2 through 5 is
A) less than or equal to 80.
B) greater than 80 but less than or equal to 85.
C) greater than 87 but less than or equal to 90.
D) greater than 90.
Correct Answer:
Verified