The central line on a p-chart is 0.50 with an UCL of 0.65 and a LCL of 0.35.The results of the next six samples are 0.60,0.37,0.45,0.48,0.53,and 0.62.What should you do?
A) Nothing; the process is behaving as expected.
B) Explore the assignable causes because three observations are above the central line.
C) Explore assignable causes because there is a run.
D) Increase the sample size to get a better measure.
Correct Answer:
Verified
Q26: A manufacturer of silk inspects each bolt
Q83: An operator of a filling machine plotted
Q134: Table 6.1
Factors for Calculating Three-Sigma Limits
Q135: Table 6.1
Factors for Calculating Three-Sigma Limits
Q136: Table 6.1
Factors for Calculating Three-Sigma Limits
Q137: Table 6.1
Factors for Calculating Three-Sigma Limits
Q139: Table 6.1
Factors for Calculating Three-Sigma Limits
Q140: A company is interested in monitoring
Q141: Use the information from Table 6.3.What is
Q142: Table 6.2
Observation Number
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents