The method used most often for setting time standards for a job is
A) the elemental standard data approach.
B) the time study method.
C) the predetermined data approach.
D) the work sampling method.
Correct Answer:
Verified
Q18: The standard time for a work element
Q19: Work measurement is the process of creating
Q21: Work standards would NOT be helpful for
Q23: When a work analyst needs a high
Q25: The continuous method of timing work elements
A)
Q26: Which of these drawbacks would be considered
Q85: Special training is required for observers using
Q89: An advantage of the elemental standard data
Q93: Which one of the following statements about
Q118: When using work sampling, the times of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents