Distribution resource planning (DRP) is
A) a transportation plan to ship materials to warehouses.
B) a time-phased stock replenishment plan for all levels of a distribution network.
C) a shipping plan from a central warehouse to retail warehouses.
D) material requirements planning with feedback loop from distribution centres.
E) a material requirements planning package used exclusively by warehouses.
Correct Answer:
Verified
Q65: When safety stock is deemed absolutely necessary,
Q70: Linking a part requirement with the parent
Q81: Which of the following is a step
Q82: Which of the following statements is true
Q82: An item's holding cost is 60 cents
Q83: One of the tools that is particularly
Q88: A popular point to start without math
Q89: The extension of MRP which extends to
Q94: For the lot-sizing technique known as lot-for-lot
Q98: A firm makes numerous models of mowers,
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents