If safety stock is desired it should be built into which portion of MRP?
A) any
B) none
C) raw materials
D) finished assemblies
E) either raw materials or finished assemblies
Correct Answer:
Verified
Q56: Which of the following best describes a
Q65: When safety stock is deemed absolutely necessary,
Q70: Linking a part requirement with the parent
Q73: The MPS calls for 50 units of
Q74: In MRP record calculations, the appearance of
Q75: Each R requires 2 of component S
Q76: Low level coding means that
A) a final
Q81: Which of the following is a step
Q82: Which of the following statements is true
Q94: For the lot-sizing technique known as lot-for-lot