Currently there are 5 tasks that need to be performed. These tasks, ABCDE, have required times of 3 minutes, 4 minutes, 7 minutes, 2 minutes, and 9 minutes respectively. The assembly line needs to produce 65 units per day to meet demand and can work for up to 10 hours each day.
A. What is the required cycle time?
B. What is the theoretical minimum # of workstations?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q161: An assembly line is assigned as follows.
Q161: A work cell is scheduled to build
Q162: A manufacturing work cell has a takt
Q163: A work cell is scheduled to build
Q164: An assembly line with 11 tasks is
Q165: A manufacturing work cell has a takt
Q166: An assembly line with 11 tasks is
Q167: An assembly line has been designed
Q168: An assembly line has been designed
Q171: Currently there are 5 tasks that need
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents