An electronics manufacturer makes remote control devices for interactive-cable-TV systems. The following assembly tasks must be performed on each device.
a. Draw the precedence diagram for this problem.
b. What is the sum of the task times?
c. What cycle time will allow the production of 200 units over a ten-hour day?
d. What is the theoretical number of workstations needed?
e. Balance this assembly line using the heuristic most following tasks and the heuristic longest operation time.
f. How do these two solutions differ? Which do you prefer; why?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q99: A work cell is required to make
Q145: A facility is trying to set
Q146: Brandon's computer shop has hired a consultant
Q146: A company is designing a product
Q147: A firm operates a flow shop
Q148: Hemo-tech, Inc., a biomedical technology and
Q151: An insurance claims processing center has
Q152: An airport is trying to balance
Q154: There are three work centers (A,
Q155: You have been asked to balance
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents